Skip to content

NICEIC Approved Contractor No. 616773000

Landlord Electrical Safety Rules in England

A plain-English summary of what the Electrical Safety Standards Regulations require of landlords, and the deadlines that matter.

Updated 26 October 2026 · 3 min read · By Elec Comply Ltd, NICEIC Approved Contractor No. 616773000

In short

  • The electrics must be inspected and tested at least every 5 years, or sooner if the last report says so.
  • Tenants get a copy within 28 days of the inspection; new tenants get one before they move in.
  • Required remedial work must be done within 28 days, or sooner if the report says so.
  • Councils can impose financial penalties of up to £40,000 for breaches.

Who the rules apply to

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to landlords of most private rented homes in England, including HMOs. Since 2025 they have also applied to social landlords, who must check the electrical equipment they supply as well. Our social housing page covers those extra duties.

This guide covers England only. Wales and Scotland have their own rules.

What you must do

Have the installation inspected and tested by a qualified personAt least every 5 years, or by the earlier date in the last report
Have it inspected and tested before a new tenancy startsBefore the tenancy begins
Give existing tenants a copy of the reportWithin 28 days of the inspection
Give a new tenant a copyBefore they move in
Give a prospective tenant a copyWithin 28 days of a written request
Give the council a copyWithin 7 days of a written request
Carry out remedial or investigative work the report requiresWithin 28 days of the inspection, or the shorter period in the report
Send written confirmation of the work, with the report, to tenants and the councilWithin 28 days of the work being completed
Keep the report and give a copy to the next inspectorUntil the next inspection

Who counts as a qualified person

The regulations require a person competent to carry out the inspection, testing and any remedial work. Using a contractor registered with a competent person scheme, such as an NICEIC Approved Contractor, is the simplest way to show you chose someone competent.

If a tenant will not give access

Since 2025 the regulations say a landlord is not in breach if they can show they took all reasonable steps. Keep a record of every attempt to arrange access: letters, emails, texts and missed appointments. Failing to start legal proceedings does not, on its own, mean you did not take reasonable steps.

What happens if you do not comply

If a council believes a landlord is in breach, it can serve a remedial notice requiring the work. It can also arrange the work itself and recover the cost, and impose a financial penalty. Council enforcement policies now give the statutory maximum as £40,000.

How we help

We arrange access with your tenants, carry out the inspection and email you the digital report to pass on. If anything needs fixing, you get an itemised quote first. See EICR testing, or send us your portfolio if you manage several properties.

Common Questions

How often does a rented property need an EICR?

At least every five years, or sooner if the last report recommends an earlier date.

Do I need a new EICR for every new tenant?

You need a valid report in place before the tenancy starts, and the new tenant must receive a copy before moving in. If the current report is still within its inspection date, a new one is not normally needed for each tenancy.

What is the maximum fine?

Councils can impose a financial penalty of up to £40,000 for a breach of the duties.

Sources

This guide covers England and is general information, not legal advice. Links open in a new tab.

Get in touch

Is an inspection due on one of your properties?

Tell us the property address and what you need, or call 07925 063137.

Call Now Request a Quote